West system Interchange
Project Location
Council Bluffs, IA
Project Description
Reconstruction of the West System Interchange provides for efficient and safe vehicle movement on both I-29 and I-80 systems. The left-hand entrance and exit from I-29 to I-80 were eliminated as part of the reconstruction. An increase in the number of travel lanes for both I-80 and I-29 allows motorists to reduce the number of lane changes needed between I-80 and I-29.
The project included full reconstruction of this system to system interchange, providing full access from I-80 and I-29 to the I-80 express lanes and the I-29/I-80 local lanes in the Dual, Divided Freeway. The West System Interchange reconstruction projects are located approximately one-half mile east of the Missouri River where I-80 intersects I-29 near the Council Bluffs Recreation Complex.
The West System Interchange was fully completed and opened to traffic in 2019.
Project Schedule
Phase Ia Construction: 07/2009 – 11/2014
Phase Ib Construction: 06/2012 – 11/2014
Phase II Construction: 06/2015 – 07/2017
Additional Construction to Connect Roadways: 01/2017 – 10/2019
Project Gallery
[Click each thumbnail for larger image]Project references
Project Name: West System Interchange
Project Number(s): Bridge IM-NHS-029-3(80)52--03-78; Bridge IM-NHS 029-3(81)52--03-78; Grade IM-NHS-029-3(86)52--03-78; Grade IM-NHS-029-3(87)52--03-78; Grade IM-NHS-80-1(392)0--03-78