Nebraska Avenue Interchange

Nebraska Avenue

Project Description

The Nebraska Avenue Interchange reconstruction involves rebuilding the folded diamond interchange in order to meet current design standards and capacity needs. The reconstructed interchange will be similar to the existing interchange configuration with two loop ramps and two diagonal ramps north of Nebraska Avenue. The Nebraska Avenue interchange Interchange on I-29 is located on I-29 approximately one-half mile north of the I-80/I-29 interchange.

  • Improved sight distances at the Nebraska Avenue intersection
  • Additional through lanes on I-29

Project Schedule

Anticipated Construction: 11/2019 — 10/2021

PROJECT FACTSHEET
Project Map
Project Map
Current Conditions (Dec 2016)
Current Conditions (Dec 2016)

Project Gallery

Project references

Project Name: Nebraska Avenue Interchange
Project Number(s): IM-NHS-029-3(141)53—03-78, IM-029-3(142)53—13-78, IM-029-3(68)53—13-78